news

Focus on current issues

What are the trial steps for injection molds?

Optimize mold design and process parameters, avoid unnecessary errors, achieve a multiplier effect, and meet the high-quality requirements of mass production. In this way, even if the materials, machine settings or environmental factors change, a stable and uninterrupted mass production environment can still be ensured. Most of the defects of molded products are caused during the plasticization and injection molding stages, but improper mold design and poor mold structure are the root causes! Trial mold influence factors: mold cavity number, cold/hot runner system design, injection inlet Type, location and size, as well as the structure of the product itself. Therefore, in order to avoid product defects caused by mold design, we need to analyze the mold design and process parameters when making the mold. It needs to be emphasized that the purpose and focus of mold trial is to optimize the mold and process to meet the requirements of mass production, not just to test out good product samples.

The first step: mold dry run test
1. Inspection of mold opening and closing under low pressure
2. Inspection of mold ejection system (under low pressure)
3. Inspection of mold reset
4. Check the movement of the row position (slider), mold dry run test

Step 2: Test the balance of the injection molding cavity
1. Continuously hit 5 molds in turn, and weigh their weight
2. Record the weight of each product in each mold
3. Reduce the injection volume and fill up 3 molds each with 20%, 50%, and 90% samples in sequence
4. Weigh and record the weight of each of the above products
5. If the difference between the maximum weight and the minimum weight of the product is less than 2% of the weight, it is acceptable-if the weight fluctuation error is within 2%, it indicates that the cavity is balanced, otherwise the injection is not balanced
6. If it is a single-cavity mold, it is also necessary to test the balance of the injection of glue (observe the actual situation of the glue).

The third step: the test of the holding time (gate freezing) time
1. When the pressure holding time is set to 1 second, 3 molds are formed each time
2. As shown in the table, increase the pressure holding time and reduce the cooling time in order to make the whole cycle unchanged (until the gate is frozen and sealed and the product weight does not increase) Ⅲ. Set multiple different as shown in the figure below Holding pressure time, each time forming 3 mold products, weigh the product weight in the specified cavity, and record the data in the table in turn. Ⅳ. Determine the better holding pressure time according to the chart.

The fourth step: the determination of a better clamping force
1. When the holding pressure switch position/holding pressure is set to the best, the clamping force is set to within 90% of the maximum clamping force, 3 molds are formed, and the weight of each mold product is recorded
2. The clamping force is reduced by 5Ton in turn, 3 molds are formed each time, and the product weight of each mold is recorded until the weight of the product suddenly becomes larger, and the weight increases by about 5% when flashing around the product begins to determine the better clamping force.

The fifth step: the determination of a better cooling time
1. When the injection molding process conditions are appropriate (after the product is full), estimate the cooling time (primarily choose a longer cooling time to completely cool the product), shoot 3 molds, and measure its size
2. Record the product size in the table and observe the deformation of the rubber parts. Ⅲ. Reduce the cooling time of the product by 1 second, and hit 3 molds. Ⅳ. Reduce the cooling time until the product begins to deform and the size begins to decrease. Ⅴ. Each cooling time The size of the injection molded product should be measured after the plastic part is fully cooled (about 15 minutes). Ⅵ. The basis for determining a better cooling time-the determination of a better cooling time considering the dimensional stability of the product

Step 6: Test the flow of cooling water
1. When the injection molding process conditions are appropriate (after the product is full), estimate the cooling time (primarily choose a longer cooling time to completely cool the product), shoot 3 molds, and measure its dimensions. Ⅱ. Record in the table below Product size, observe the deformation of the plastic parts
2. The product cooling time is reduced by 1 second, and 3 molds are used. Ⅳ. Reduce the cooling time until the product begins to deform and the size begins to decrease. Ⅴ. The product injected during each cooling time should be fully cooled after the plastic part is fully cooled ( It takes about 15 minutes) to measure its size. Ⅵ. The basis for determining a better cooling time-a test that considers the dimensional stability of the product and the flow of cooling water

Step 7: Test the uniformity of mold cooling
1. Use a mold temperature measuring instrument to measure the temperature of 10 points in each of the core and cavity, and record them in the table below
2. The difference between the actual temperature at each measurement point and the average value should be less than 2°C. If the difference from the average value exceeds 2°C, it indicates that the mold cooling effect is uneven, and the cooling system mold cooling uniformity test should be improved.

Step 8: Determine the best injection speed
1. Record hydraulic oil temperature, melt temperature and mold temperature
2. Set the end position of the sol first, and only use the first level of glue
3. Set the holding pressure and holding time to zero, and after determining the starting position of injection, gradually increase the injection speed
4. Adjust the injection speed and fill to 95% of the rubber part (observe whether there is any padding, leave a 5-10mm padding amount)
5. Record the highest injection speed reached when filling to 95% of the rubber part
6. Record the highest injection speed and peak pressure of injection in the "Injection Speed ??Analysis Data Sheet"
7. Gradually reduce the injection speed, increase the injection pressure, observe and record the peak injection pressure when the rubber is filled to 95% of the position
www.ydjsjt.com

主站蜘蛛池模板: 亚洲国产精品原创巨作av | 激情综合色五月丁香六月亚洲 | 日韩aaa| 成在线人av无码高潮喷水 | www17com嫩草影院 | 久久久成人网 | 黄色免费毛片 | 色综合色天天久久婷婷基地 | 成人福利免费视频 | 香草乱码一二三四区别 | 日韩久操 | 日本www.在线中文字幕 | 少妇愉情理伦片高潮日本 | 激情午夜av| 欧美日本成人 | 欧美性xxxx极品hd欧美风情 | 免费观看又色又爽又湿的视频 | 亚洲精品国产精品乱码在线观看 | 国产高清精品在线 | 亚洲精品国产主播一区 | 日本高清在线中字视频 | www色网站 | 性殴美69xoxoxoxo| 亚洲三级网 | 2018天天干天天操 | 免费男人下部进女人下部视频 | 国产成人成网站在线播放青青 | 欧美与黑人午夜性猛交久久久 | 日韩精品偷拍 | 日本熟妇大屁股人妻 | 精久国产一区二区三区四区 | 中文字幕亚洲综合久久蜜桃 | 亚洲二区在线视频 | 亚洲制服有码在线丝袜 | www夜片内射视频在观看视频 | 国产成人免费xxxxxxxx | 欧美片内射欧美美美妇 | 国产中文在线播放 | 一本色道久久东京热 | www免费av| 欧美人一级淫片a免费播放 少妇被粗大的猛烈进出视频 | 搡8o老女人老妇人老熟 | 国产精品麻豆免费观看 | 久久久久久久久久久久网站 | 特级淫片aaaaaaa级附近的 | 成人乱人伦视频在线观看 | 中文字幕制服丝袜人妻动态图 | 精品丝袜在线 | wwwav日韩 | 色呦呦国产精品 | 九九激情网 | 国产黑色丝袜在线观看片不卡顿 | 国产tscd人妖同性另类调教 | 毛茸茸熟妇丰满张开腿呻吟性视频 | 91视频日本 | 婷婷色香五月综合缴缴情香蕉 | 国产99视频精品免视看7 | 国产成a人片在线观看视频下载 | 国自产拍偷拍精品 | 狠狠色狠狠色合久久伊人 | av在线浏览 | 欧美日韩中文国产一区发布 | 国产乱妇乱子在线播放视频 | 日韩免费av片 | 91福利视频网站 | 人妻被按摩师玩弄到潮喷 | av导航在线 | 5x社区未满十八在线视频 | www片香蕉内射在线88av8 | 网站黄在线 | 国产麻豆精品一区二区三区v视界 | 免费吃奶摸下激烈视频青青网 | 天堂资源最新在线 | 粗大的内捧猛烈进出少妇 | 我要看www免费看插插视频 | 人人九九精 | 中文字幕乱码在线播放 | 日韩欧美tⅴ一中文字暮 | 日本一本免费一二区 | 视频在线一区二区 | 国产一区二区三区日韩精品 | 午夜剧场福利社 | 成人年无码av片在线观看 | 亚洲日本欧美日韩中文字幕 | 啪免费视频| 台湾a级艳片潘金莲 | 青青青操 | 亚洲h在线播放在线观看h | 亚洲视频欧美视频 | 欧美日韩一区二区久久 | 国产精品videosex极品 | 国产啊v在线 | 中文字幕免费中文 | 色播一区二区 | 亚洲欧美黑人猛交群 | 成人伊人亚洲人综合网站 | 小荡货好紧好爽奶头大视频 | 丁香五精品蜜臀久久久久99网站 | 91欧美一区二区三区 |